How to decorate and design a new house, and what are the precautions for interior design?

   Do you need an honest and reliable decoration company to provide you with value for money, guaranteed quality outdoor decoration, interior decoration, painting, waterproofing engineering, and give you a warm surprise for your new home? If necessary, please contact us.

   Contact Number:081-656-5808,Email:sunnydecorty@gmail.com。

How can you repair a house without understanding the decoration process and various details? How to decorate a new or old house? What should I pay attention to? How to find a reliable decoration company? How much does the renovation budget cost? These are all things that need to be understood and prepared before decoration. How to decorate a new or old house? A reliable decoration company? The editor will introduce it now.

1748f1db2e990fa006f9702ac8e7a6e9

Preparation work for decoration of new and old houses

The first point is to plan the decoration budget reasonably

Divide your decoration budget into 80%, with 20% as a contingency fund and 80% as the total decoration cost. Inform the business manager and designer of the decoration company of your decoration needs and the total decoration cost (80% portion).

The second point is to pay a deposit and measure the house on-site

Usually, a symbolic deposit is paid, which will be refunded even if the decoration company is not used in the end.

After finding a decoration company, visit and measure the house. The measurement data should be recorded well, including the overall decoration area, the amount of paint applied, and the amount of bricks laid, so as to have a clear understanding.

The third point is for the designer to create a design plan

Based on the layout, area, and your needs of your home, the designer will produce several versions of decoration design renderings.

The fourth point is to look at the decoration quotation and sign the contract

The decoration quotation has been handed over to you. At this point, it is important to take good care of all decoration projects, including the model and brand of decoration materials.

Half package decoration involves purchasing the main materials oneself, while the decoration company provides construction and auxiliary materials. All inclusive services are provided by the decoration company, except for furniture and household appliances.

Remember to include 0 additional items in the contract if you do not want them to be added.

Pay attention to various traps when signing contracts.

Preparation work before decoration of new and old houses

1. Coordination of relationships among all parties

Obtain the property commencement certificate and greet neighbors

2. Preparation of various decoration materials for new and old houses

Purchase the main decoration materials according to the construction stage, and pre order the materials that need to be customized.

Decoration construction

The order of decoration for new and old houses is generally water, electricity, wood, tiles, and oil.

3. Demolition and renovation will take 7-15 working days, including cleaning up garbage and building new walls.

4. Prepare water and electricity, measure various dimensions such as cabinets, refrigerators, trailers, sinks, etc., find the location, and create a water and electricity diagram.

5. Water and electricity construction takes 7-15 days, with the line following horizontal and vertical alignment, and the water pipes running on the top to distinguish between hot and cold water pipes. Reserve multiple lines. After completion, conduct water and electricity acceptance and water pipe pressure test.

6. Woodworking construction takes 7-15 days

7. Tile construction takes 7-15 days

8. Painting stage 7-15 days

9. Installation phase